The $ 16.7 billion renewed road section is 13.7 kilometers long. In the section between Letenye Muraszemenye and Muraszemenye Tornyiszentmiklós, the existing double lane road has been expanded to two double lanes, and five new bridges and two gateways have been built.
The section of motorway to motorway will then be driven at 130 km / h.
As part of a project supported by the European Union, the effectiveness of flood protection in Muraratka was increased by the construction of so-called "pipe bridges".
(Source: vadess.hu / Photo: pixabay.com)